Water abstraction licence
Water abstraction is the act of taking a certain quantity of water from a source of supply (inland water or surface sources - such as rivers, canals, streams - or underground sources). A water abstraction licence gives someone the right to undertake this action.
Ref https://www.gov.uk/guidance/water-management-abstract-or-impound-water#water-abstraction
The water abstraction licence application includes a set of forms which are in themselves reasonably straightforward, requiring information such as company details of the applicant (usually the principal contractor) and anticipated dewatering rates.
Obtaining a licence may be necessary for people who wish or plan to abstract more than 20 cubic metres of water per day. The Environment Agency may take enforcement action against those who do not apply before abstracting water.
Ref https://www.gov.uk/guidance/water-management-apply-for-a-water-abstraction-or-impoundment-licence
[edit] Related articles on Designing Buildings
- Dewatering construction sites.
- Environment Agency.
- Hydrogeological Impact Appraisal HIA.
- Passive dewatering.
- Raising awareness of dewatering regulation.
- Water engineering.
- Water impoundment licence.
- Water management.
- Water pump.
[edit] External resources
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.